Service · Showers

Shower Door Replacement in Greater Seattle

Shower door replacement on the opening you already have. Tim measures it in person, we take the old door out, and new glass cut to fit goes in.

Frameless glass shower door with a matte black handle and hinges in a Clyde Hill, WA guest bath, installed by IGo Green Enterprises

Overview

About door replacement in Seattle

A replacement door goes on the opening you already have. The old door comes out, Tim measures what is actually there, and the new glass is cut and tempered to fit it. No tile work is needed unless the tile or the wall behind it has failed.

Replacing an old shower door: what we fix

Replacing an old shower door is the fix for most of the problems we get called about. Each of these is a job we do:

  • When a framed door’s track has corroded, we pull the frame and track and put up frameless glass with cleaner hardware.
  • When a slider drags or jumps its track, we fit a new slider on rollers rated for the weight of the glass, anchored into the wall framing.
  • When a panel cracks or shatters, we make a matching tempered panel for sound hardware, or replace the whole unit when the hardware is failing too.
  • When a door leaks at the curb or the hinge side, we measure the opening as it is now, since older walls are rarely plumb, and set the new door and its sweep to it.
Frameless glass shower door on a low tiled curb in a Clyde Hill, WA bathroom, installed by IGo Green Enterprises Frameless shower door and fixed glass panel with matte black hinges in a Clyde Hill, WA guest bath, installed by IGo Green Enterprises
Frameless doors we installed in a new Clyde Hill home listed at $12M. Frameless glass like this is a common choice when an old framed door comes out.

How a replacement visit works

  1. Call or send the form. Photos of the old door help us get ready.
  2. Tim comes out himself to measure. The visit takes about 30 to 45 minutes. He checks plumb, square, the curb and the wall behind the door, and goes over glass and hardware with you.
  3. A written quote follows, based on your actual opening.
  4. The glass is cut and tempered to the template. Most jobs run about 1.5 to 2 weeks from the measure to the install.
  5. On install day, the old door comes out, the opening is cleaned up and the new door goes in, usually in a half-day.

What a new shower door costs

On our jobs around Greater Seattle, a typical standard shower door runs about $1,800 to $2,200 or more installed (IGo Green Enterprises, November 2026). That is a rough range, not a quote. Size, glass type and hardware move it most. Our shower door cost guide goes through each one, and your number comes in writing after the measure.

Why homeowners call us for a new door

  • Tim, our founder, does the measure and the install himself.
  • A replacement gets the same glass and hardware grade as our new construction work. There is no lighter retrofit line.
  • Every install carries our 1-year adjustment warranty for hardware tweaks and settling.

One homeowner put it this way: “Everything was done in a timely manner with the highest quality I’ve seen so far. I’m very impressed with the results.” (Natalya C.)

Where we replace shower doors

We work across King and Pierce counties, from Seattle and Bellevue south to Kent, Federal Way and Tacoma. Older homes in Burien and Des Moines are some of our most common replacement jobs. Ready for a new door? Request a free quote or call 206-715-6166.

Included

What's included in every door replacement install

  • In-home measure with Tim
  • Removal of the old door
  • Glass and hardware selection
  • New glass cut and tempered to the measured opening
  • Install and post-install adjustment
  • 1-year adjustment warranty

Options

Door Replacement configurations

Framed door to frameless glass

The frame and track come off and a frameless door goes on the same opening. See our frameless shower doors page for the hardware and glass choices.

New tub door

A seized bypass slider comes out and a new framed slider, frameless slider or hinged door goes over the tub. Our tub shower doors page covers each one.

Glass panel only

When the hinges and clips are sound, we make a matching tempered panel to fit them and leave the hardware in place.

FAQ

Frequently asked about door replacement

Plan your project

Ready to plan your door replacement?

Four short steps, with room for photos. Or call if you'd rather talk it through.

Step 1 of 3

What are you looking to install?

Pick one or more.